It’s Here!

  The chapel sign has finally arrived! So if you couldn’t find us in Whitchurch before you shouldn’t have any problems now! A rather sizeable 8.5ft tall! Make sure you keep an eye out for us!  

MAYbe the busiest month so far

  With every month that passes, we get busier and busier. May has seen so many different developments, let’s recap a few! Every aspect of the Chapel build gets our full attention, from the garage doors to the colour of the guttering. Water holes were emptied and filled with concrete before the beams and concrete blocks…

Floor Time

  After the holes in the floor were emptied of water the concrete went in..finally!   The concrete needed to dry first, then the beams were put in place ready for the blocks to slide in.   Then the satisfying moment of smoothing  the concrete on-top of the long awaited floor! We have to admit, its…

A Team Visit

The ground floor is finally in and the 3fD team wanted to test the waters and have a look around at all the exciting developments that have been happening in the Chapel as of late. Don’t step back – that’s wet concrete floor in the entrance. It is changing so much! We can really see ourselves…

Fancy a tour?

You’ve seen the pictures, you’ve watched the videos, now take your own personalised tour of the 3fD Chapel Gym! Stretch & click below… Gym Showroom

See the future through our eyes

If you have driven through Whitchurch and seen the Chapel from the outside, it may be difficult to picture the finished product. So let us help, just press play!  

Clip of the day

A picture tells a 1000 words, a video says it all. Click play…

April Showers

  April had many hurdles to overcome, mainly with the floor.   With the increased amount of water seeping in from the River Test, filling the holes in the Chapel, even the digger struggled not to sink through the floor. All that soil has to go somewhere..   We are thankful April came with a new roof !…

Flooding of Whitchurch

‘Evil Atlantic depression’ is what the random heavy downfall of rain is being blamed on, and with rain comes floods, and it didn’t take long for the water to rise through the entire Chapel. We weren’t the only ones effected in Whitchurch though, with local shops and pubs feeling the stain from the rain and…

Waiting for the concrete

The River Test flows through Whitchurch, and apparently our floors in the Chapel… Today we are removing the water from the holes and then filling them with concrete to ensure the water is locked out. Only problem is, the concrete hasn’t arrived yet, could be an issue if the water starts to creep back in.. Hurry…

Ground Designs

You’ve seen the first floor, now it’s time to have a look at our plans for the ground floor. Here is a more detailed look at the floor plan  ↓ Make sure you visit our blog regularly so you can be kept up to date on all things Chapel!

Roof Roof

The main Chapel roof is on, and in only one day! How you ask? By using Nulok roofing system! Firstly Nulok battens are fixed to the rafters in the conventional way, replacing traditional timber battens. Then specially designed Link Channels are snap fitted to the battens to form an interlocking grid system. And finally our slates are slotted…